KITCHEN RENOVATION

A kitchen turns out well when the order is right

Most problems in a kitchen renovation are about sequence, not craftsmanship. A socket that ends up behind a drawer. A worktop ordered before the units are in place. A water pipe that has to be moved when the floor is already laid. A kitchen with a drawing, fixed measurements and appliances chosen before the first cabinet comes out is quicker and cheaper to build.

Relut removes the old kitchen, fits units, doors and worktops and does walls, painting and floors. Electrical installations are carried out by a registered electrical contractor, and water and waste by a Säker Vatten-authorised plumbing firm that we work with. We coordinate them with our own work. Who does what, and who is responsible, is set out in the written quote. Home visits and quotes are free throughout Stockholm County.

What we do in your kitchen

We do the building work ourselves, and the installations are done by partner firms with the right authorisation.

  • Removing the old kitchen

    We take out cabinets, worktop, splashback and old flooring and take it all away. Water and electricity are disconnected by a qualified partner before we start stripping out around the sink and cooker.

  • Walls, filling and painting

    We repair the walls behind the old kitchen, add reinforcement where wall units will hang, then fill and paint. If a wall is to be moved or opened up, we first assess whether it is load-bearing.

  • Kitchen flooring

    We lay a new floor or repair the existing one where the old kitchen stood. Whether the floor runs under the units or stops at the plinth depends on the floor type and the manufacturer’s instructions.

  • Units, doors and drawers

    We fit the units level and plumb, screw them together, fix the wall units to a reinforced wall and adjust doors and drawers so the gaps are even along the whole kitchen.

  • Worktop and splashback

    We cut and fit laminate and wooden worktops and make the cut-outs for sink and hob. Stone worktops are measured and delivered by the stone supplier once the units are in place.

  • Electrics and water

    A registered electrical contractor runs power to the hob, oven and sockets. A Säker Vatten-authorised plumbing firm connects the tap and dishwasher and fits leak protection. We coordinate the timing.

From the old kitchen to the finished result

The same kitchen before renovation, after strip-out and when finished.

Kitchen before renovation with grey cabinet doors, pink tiles and a sink.

1. Before renovation

The previous kitchen with grey cabinet doors and tiles.

View the full photo

Kitchen after strip-out with most cabinets removed, exposed pipes and a ventilation duct.

2. After strip-out

Cabinets and worktops have been removed. Walls and services are exposed.

View the full photo

Finished kitchen with white cabinet doors, glass-fronted cupboards, a dark worktop and a white sink.

3. Finished kitchen

White cabinet doors, glass-fronted cupboards and a dark worktop.

View the full photo

GOOD TO KNOW

What you should know before you strip out

Four things that decide how the kitchen should be planned and who is allowed to do what.

  1. You may not do the wiring yourself

    According to Elsäkerhetsverket (the Swedish Electrical Safety Authority), you may not make changes to the fixed installation. New or moved sockets, new cable in the wall and replacing an unearthed socket with an earthed one must be done by a registered electrical contractor. A new kitchen almost always means changes of this kind, because the hob, oven and dishwasher need power in new places. So decide on your appliances early, so the electrics can be planned before the walls are closed up.

  2. Leak protection at the sink and dishwasher

    Säker Vatten’s trade rules 2026:1 apply from 1 January 2026 and require active protection against water damage in the kitchen. The sink cabinet must have a watertight insert or a collecting tray with a moisture sensor connected to a leak breaker, water fault breaker or water alarm. The dishwasher must stand over a collecting tray and have a shut-off valve that is easy to reach. The connection pipe to the machine must be run without joints.

  3. The extractor is part of the building’s ventilation

    Boverket’s regulations require that air pollutants from cooking can be dealt with at the source. How the extractor may be connected depends on the building’s ventilation. In a block of flats the flats often share ducts, and in a housing cooperative flat (bostadsrätt) a change to the ventilation requires the board’s permission. Ask the cooperative which type of extractor is allowed before you buy. A recirculating carbon-filter hood that is not connected to the duct may be the alternative.

  4. Worktop, measurements and working height

    Laminate is hard-wearing but sensitive to water at joints and cut-outs, so the edges at the sink and hob must be sealed. Solid wood needs oiling regularly. Stone and composite are templated after the units have been fitted, which means a wait between fitting and a finished kitchen. The working height is set with the plinth legs. Check it against the dimensions of the dishwasher and oven, and against the people who will be doing the cooking.

How it works

How to get started

Three steps to a price you can make a decision on.

  1. Describe the kitchen

    Get in touch and tell us what you have in mind: a new kitchen in the same place, a changed layout or just new doors and worktop. If you have a kitchen drawing or a quote from a kitchen supplier, please send it along.

  2. Free home visit

    We measure the room, check whether walls and floors are straight and see where water, waste, electrics and ventilation are today. Then we know what can stay and what has to be moved. The visit is free in Stockholm County.

  3. Written quote

    The quote describes strip-out, walls, floors and fitting, which electrical and plumbing work our partner firms carry out, who is responsible for what, which materials are included and how the ROT deduction (ROT-avdrag) is calculated on the labour cost.

What affects the price?

What matters most is whether the kitchen stays in the same place or whether water, waste, electrics and extractor are to be moved. After that come the number of cabinets, the type of worktop, the condition of the walls and floor, and whether you buy flat-pack or ready-assembled units. The ROT deduction (ROT-avdrag) is 30 per cent of the labour cost, up to SEK 50,000 per person per year. Cabinets, worktop, appliances and travel give no deduction. You get the price in a written quote.

Book a free home visit

Would you rather talk to us directly? Call or email us

Free kitchen renovation home visit in Stockholm County

Tell us what you want done and we will get back to you. Call, email or fill in the form. The home visit and the quote cost nothing, wherever you live in Stockholm County.

Read how Relut handles your details.

Frequently asked questions

Straight answers about Kitchen renovation before you decide.